More caulking between the shelves and trim and base boards need to be done before the final coat of paint can be done in each room so there is still a lot of work to be done. The granite counter tops should be delivered on Monday the 26
th of April, so my contractor can start installing them in the kitchen, on the wet bar, and the bathrooms, and then I think we will be left with finishing up the flooring throughout the entire house! I can't wait until it is done and I can move my whole family in and get settled! Did I already say this is so exciting!
These river rock stone make up the custom made walk-in shower floors in our master bathroom. Our contractor has been so creative in the design of it all. Amazing!
Beige
Travertine tiles make up the walls of our walk-in master bathroom shower.
The upstairs family room and laundry room will be this serene sage green color. This is a picture of where the wet bar will be.
The other 4 bedrooms will be the same neutral beige color as the bathrooms.
Matt's office and the entire downstairs kitchen, dining and family room will be bright yellow! My happy color!
The first coat of paint in all the bathrooms! A pretty neutral color.
Our contractor custom made our beautiful front door!
Do you think we have enough cabinet space in our kitchen!
Cabinets in the kitchen are being installed!
Yesterday we had to meet with our contractor to go over some things at the new house. As they do the finishing touches on the interior, its beginning to get very exciting!