Saturday, April 24, 2010

What happened to March!

All of these pictures were taken on April 13th and it took me this long to upload them all!

Some kind of GRAY cement boards that lay over the red and black liners in the master shower. Looks pretty heavy duty to me!
Something RED on the shower floor lining...

Three layers of stuff...(no idea what it's called) were placed in the Master walk-in shower to prevent leakage in case the tile cracks! Something Black...

We let our contractor choose the tiles for the bathrooms and I love it!

The tile for the boys bathroom shower are almost done and they are currently working on grouting it.

A counter with a door to the laundry shoot and shelves have been made for the boys bathroom so mama doesn't have to carry the laundry down the stairs!

Custom shelves were built for Matt's office closet!

Rods were placed in all the other bedroom closets!

Shelves were built in the walk-in closet.

The banister has been installed in the stairwell.

Here is La'a's and Makaio's bedroom closet and doors. With the white trim around the closet and windows.


So it's April 23rd and time has just flown by! Regarding the new house, most of the month of March was spent on doing the dry wall. Hanging it, taping it and texturing it. Who new it would take a whole month to do the dry wall...but Willie did an excellent job! It looks really nice. The first 2 weeks of April was spent on putting the the trim around the windows and doors and hanging the doors and shelves in the closets. Take a look!